Structural Worksheet.
Competed
In Progress
Fibrillation or Indecision.
Worksheet 1
- Strip down the entire Rod to bare metal.
- Weld all joints and inspect integrity.
- Grind and clean up all joints and edges
- Fit the rear boot hinges.
- Fit the rear 'dog tail'
- Fabricate exhaust bracket from engine to frame.
- Weld drip feed oiler to rod chassis.
- Weld pressure gauge perch to rod chassis.
- Mount radio comms box to LHS mudguard.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.